Dieses Stellenangebot ist nicht mehr verfügbar
Quality Assurance PM, Electrical - Data Center Construction Full-time
Turner & Townsend
- Sunriver, Oregon, United States
- Sunriver, Oregon, United States
Über
*On site 5-days a week*
*Relocation assistance can be provided for the right candidate*
Responsibilities
Effectively manage and collaborate with project stakeholders.
Effective communication across our internal team to ensure efficiency and a consistent delivery to the client.
Can analyze, track, and effectively manage critical milestone activities to avoid schedule slip.
Verify that effective project governance, processes and systems are utilized.
Ensure application of best practice on all projects.
Production of formal project status reports and other reports as required.
Monitor the progress of multiple construction projects simultaneously to ensure that the approved design standards are being applied correctly.
Manage the interface between all suppliers through monthly trackers and weekly reviews.
Manage the flow of project information between the project team through regular meetings and written communications.
Forecast and update key project milestones.
Manage and monitor local design teams in accordance with commission criteria.
Provide technical support to owners, architects, general contractors and regional stakeholders.
Rapid response to RFIs from the field.
Provide expertise for cost control, value engineering, and constructability guidance where required.
Independent review of status reports, drawing submittals, timelines and costs from architects, contractors and suppliers.
Client management – assist in developing excellent working relationships with Clients, with a view towards maximizing new opportunities.
Strategic Thinking - provides advice to project teams on approaches that can be adopted to successfully achieve both clients’ objectives and business objectives.
Knowledge management – ensure that key information and learnings generated from each project is captured.
Process improvement – Identify ways to improve internal systems and processes
SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Qualifications
Bachelor’s degree in Electrical Engineering, Construction Management, or related field.
Minimum 5+ years of electrical project management experience, ideally in data center construction or with an electrical contractor.
Experience with substation and power distribution systems preferred.
Familiarity with MEP design
Strong leadership, communication, and problem-solving skills.
Proficiency in project management tools
Knowledge of relevant codes, standards, and construction methodologies.
Proficiency in the Data Center Commissioning Process (levels 1 –5 )
Proficiency managing construction documents including BODs, specifications, contract drawings, C/D/E’s, equipment submittals and RFIs.
Proficiency in Excel, Word, PowerPoint, Outlook, Procore, P6, CxAlloy, and other construction project management tools
Additional Information *On-site presence and requirements may change depending on our clients' needs.*
All your information will be kept confidential according to EEO guidelines.
#J-18808-Ljbffr
Sprachkenntnisse
- English
Hinweis für Nutzer
Dieses Stellenangebot wurde von einem unserer Partner veröffentlicht. Sie können das Originalangebot einsehen hier.