XX
Quality Assurance PM, Electrical - Data Center ConstructionTurner CorporationSunriver, Oregon, United States
XX

Quality Assurance PM, Electrical - Data Center Construction

Turner Corporation
  • US
    Sunriver, Oregon, United States
  • US
    Sunriver, Oregon, United States

À propos

Quality Assurance PM, Electrical – Data Center Construction
Full-time
Electrical Project Manager – Data Center Construction
On site 5-days a week.
Relocation assistance can be provided for the right candidate.
Responsibilities:
Effectively manage and collaborate with project stakeholders.
Effective communication across our internal team to ensure efficiency and a consistent delivery to the client.
Analyze, track, and effectively manage critical milestone activities to avoid schedule slip.
Verify that effective project governance, processes and systems are utilized.
Ensure application of best practice on all projects.
Production of formal project status reports and other reports as required.
Monitor the progress of multiple construction projects simultaneously to ensure that the approved design standards are being applied correctly.
Manage the interface between all suppliers through monthly trackers and weekly reviews.
Manage the flow of project information between the project team through regular meetings and written communications.
Forecast and update key project milestones.
Manage and monitor local design teams in accordance with commission criteria.
Provide technical support to owners, architects, general contractors and regional stakeholders.
Rapid response to RFIs from the field.
Provide expertise for cost control, value engineering, and constructability guidance where required.
Independent review of status reports, drawing submittals, timelines and costs from architects, contractors and suppliers.
Client management – assist in developing excellent working relationships with Clients, with a view toward maximizing new opportunities.
Strategic Thinking – provides advice to project teams on approaches that can be adopted to successfully achieve both clients’ objectives and business objectives.
Knowledge management – ensure that key information and learnings generated from each project is captured.
Process improvement – identify ways to improve internal systems and processes.
SOX control responsibilities may be part of this role, which are to be adhered to where applicable.
Qualifications:
Bachelor’s degree in Electrical Engineering, Construction Management, or related field.
Minimum 5+ years of electrical project management experience, ideally in data center construction or with an electrical contractor.
Experience with substation and power distribution systems preferred.
Familiarity with MEP design.
Strong leadership, communication, and problem-solving skills.
Proficiency in project management tools.
Knowledge of relevant codes, standards, and construction methodologies.
Proficiency in the Data Center Commissioning Process (levels 1–5).
Proficiency managing construction documents including BODs, specifications, contract drawings, C/D/E’s, equipment submittals and RFIs.
Proficiency in Excel, Word, PowerPoint, Outlook, Procore, P6, CxAlloy, and other construction project management tools.
On-site presence and requirements may change depending on our clients' needs.
Turner & Townsend is an equal opportunity employer. We celebrate diversity and are committed to creating an inclusive environment for all employees and actively encourage applications from all sectors of the community.
All your information will be kept confidential according to EEO guidelines.
#J-18808-Ljbffr
  • Sunriver, Oregon, United States

Compétences linguistiques

  • English
Avis aux utilisateurs

Cette offre provient d’une plateforme partenaire de TieTalent. Cliquez sur « Postuler maintenant » pour soumettre votre candidature directement sur leur site.