This job offer is no longer available
Material Resource Planner
- Fort Worth, Texas, United States
- Fort Worth, Texas, United States
About
Job ID: BR
Date posted: Nov. 18, 2025
Description:OCCUPATIONAL SUMMARY
Manages assigned (planner of record) production and non-production parts (including Make,
Buy, Furnished Material, Government Furnished Equipment (GFE), Government Furnished
Material (GFM), Government Furnished Property (GFP), and Government Furnished Aeronautical
Equipment (GFAE), including accurate maintenance of independent and dependent requirements
within ordering systems.
WORK PERFORMED
Inputs MRP planning parameters, as specified by Company policy. Maintains optimum inventory levels through evaluation and execution of order policy management, achieving minimum inventory investment and maximum turn rates. Coordinates with Change Implementation Cell (CIC) as necessary to ensure material masters accuracy.
Analyzes suggested order signals for dependent/independent requirements produced by MRP using reasonableness checks established by Company policies and procedures. Reviews discrepant conditions and/or exceptions to accomplish suggested corrective action. Releases valid orders and enters any authorized changes in quantity, schedule, miscellaneous content, or part number roll for non spares parts. Coordinates less-than lead time spares requirements accomplishing validation and maintenance using procurement systems including the ordering for parts considered Mission Impaired Capability Awaiting Parts (MICAP). Coordinates activities for the rework of parts. Analyzes and corrects scheduling/ordering deficiencies identified by MRP output data and/or identified by the customer/supplier. Initiates the resolution of discrepant dock receipts and receipts of non-receivables including drop shipments. Administers stop orders and terminations in accordance with Company procedures.
Analyzes and recommends the status and disposition of material declared Obsolete and Surplus (O&S) and applicable contract closeouts.
May provide and/or requests inventory adjustments as required to maintain inventory accuracy. Monitors for potential or actual shortages for assigned part numbers and takes action to resolve the shortage in accordance with Company procedures. Ensures just-in-time inventory for manual reorder point planning for plant and project stock parts numbers.
Maintains requirements to control domestic, co-production, and reconciles false inventory of non-17 production in the current MRP system.
Analyzes the Bill of Material to determine proper relationships, achieving desired results for requirements and replenishments. Performs substitution activity with applicable organizations to determine validity and obtain authorization. Directs temporary changes in the order Bill of Material or coordinates long-term changes in the product structure. Creates
Languages
- English
This job was posted by one of our partners. You can view the original job source here.