Quality Assurance PM, Electrical - Data Center ConstructionTurner & Townsend • Sunriver, Oregon, United States
Quality Assurance PM, Electrical - Data Center Construction
Turner & Townsend
- Sunriver, Oregon, United States
- Sunriver, Oregon, United States
About
Turner & Townsend provides project, cost, and commercial management services worldwide.
On site 5‑days a week.
Relocation assistance can be provided for the right candidate.
Responsibilities:
Effectively manage and collaborate with project stakeholders.
Communicate across the internal team to ensure efficiency and consistent delivery to the client.
Analyze, track, and manage critical milestone activities to avoid schedule slip.
Verify that effective project governance, processes, and systems are utilized.
Ensure application of best practice on all projects.
Produce formal project status reports and other reports as required.
Monitor the progress of multiple construction projects simultaneously to ensure that approved design standards are being applied correctly.
Manage the interface between all suppliers through monthly trackers and weekly reviews.
Manage the flow of project information between the project team through regular meetings and written communications.
Forecast and update key project milestones.
Manage and monitor local design teams in accordance with commission criteria.
Provide technical support to owners, architects, general contractors, and regional stakeholders.
Rapidly respond to RFIs from the field.
Provide expertise for cost control, value engineering, and constructability guidance where required.
Conduct independent review of status reports, drawing submittals, timelines, and costs from architects, contractors, and suppliers.
Client management – assist in developing excellent working relationships with clients to maximize new opportunities.
Strategic thinking – provide advice to project teams on approaches that can achieve both client and business objectives.
Knowledge management – capture key information and learnings generated from each project.
Process improvement – identify ways to improve internal systems and processes.
Adhere to SOX control responsibilities where applicable.
Qualifications:
Bachelor’s degree in Electrical Engineering, Construction Management, or related field.
Minimum 5+ years of electrical project management experience, ideally in data center construction or with an electrical contractor.
Experience with substation and power distribution systems preferred.
Familiarity with MEP design.
Strong leadership, communication, and problem‑solving skills.
Proficiency in project management tools.
Knowledge of relevant codes, standards, and construction methodologies.
Proficiency in the Data Center Commissioning Process (levels 1–5).
Experience managing construction documents including BODs, specifications, contract drawings, C/D/E’s, equipment submittals, and RFIs.
Proficiency in Excel, Word, PowerPoint, Outlook, Procore, P6, CxAlloy, and other construction project‑management tools.
Turner & Townsend is an equal‑opportunity employer. All applications are considered in compliance with EEO guidelines.
#J-18808-Ljbffr
Languages
- English
Notice for Users
This job comes from a TieTalent partner platform. Click "Apply Now" to submit your application directly on their site.